Skip to main content

Research Repository

Advanced Search

All Projects (9)

Evaluation of TurbineGRID Feb 1, 2019 - Apr 30, 2019
The purpose of “Evaluation of TurbineGRID: Digital Twin of the ORE Catapult Levenmouth Turbine” is to allow an evaluation of this simulation tool in a manner consistent with previous studies on other similar numerical modelling tools.

Electrifying the fleet Jan 14, 2022 - Mar 31, 2022
Audit of fishing boats around the UK with a view to investigating hte fasibility of fully or partly electrfying a range of vessel