Mr Lucas Mander L.Mander@hull.ac.uk
Research Associate
Waterbird assessment for proposed habitat compensatory sites
People Involved
Mr Matthew Stone J.M.Stone@hull.ac.uk
Field Ornithologist
Mr Nick Cutts N.D.Cutts@hull.ac.uk
Deputy Director, Institute of Estuarine & Coastal Studies (IECS)
Project Description
The project is carried out at the Proposed Skeffling and Welwick realignment sites on the behalf of the Environment Agency on the Humber Estuary. The schedule bird survey programme covers the passage period and aims to gather baseline bird data in order to address potential risks and impacts of the construction of the compensatory sites on the waterbird population.
Type of Project | Project |
---|---|
Status | Project Complete |
Funder(s) | Environment Agency |
Value | £7,200.00 |
Project Dates | Jul 15, 2016 - Mar 31, 2017 |
You might also like
Neyland marina dredging impact study Jan 1, 2017 - Dec 31, 2017
NEYLAND YACHT HAVEN DREDGING : STATISTICAL ANALYSIS 2004-2016
Analysis of benthic and sediment (particle size parameters) data for the Neyland Yacht Haven dredging project.
spatial analysis of benthic community and sedi...
Read More about Neyland marina dredging impact study.
Investigation on the origin of the deep mud habitat in Whitsand and Looe Bay MCZ Aug 26, 2016 - Jun 30, 2017
The Whitsand and Looe Bay Marine Conservation Zone (MCZ) was designated, under the Marine and Coastal Access Act (2009) in December 2013, along with 26 other MCZs. Features of Conservation Interest include intertidal rock, a variety of intertidal sof...
Read More about Investigation on the origin of the deep mud habitat in Whitsand and Looe Bay MCZ.
NIRAS - Phase 1 seabirds and their environment May 1, 2017 - Mar 31, 2018
Short initial contract to provide scope for a wider study of seabird distributions in relation to offshore energy activities.
A review of the Environmental Status of the waters of the Tidal Thames. Aug 1, 2017 - Jul 31, 2018
Changes to emission limits, made under the Large Combustion Plant Directive, gave power generation companies the option to ‘opt in’ and install pollution abatement technology or ’opt out’ and close power plants which did not comply with the new emiss...
Read More about A review of the Environmental Status of the waters of the Tidal Thames..
Assessment of the Functional Development of a Habitat Offset Site on the Humber (PHS) Oct 1, 2008 - Dec 31, 2017