Development of a next generation, highly efficient, low cost and building integrate-able solar PV/thermal system for building space heating, hot water and power supply Apr 1, 2017 - Jun 30, 2019
Through a close collaboration between the leading UK/Chinese universities and the top Chinese/UK companies, the proposed UK-China collaborative R&I project will develop a novel building integrate-able solar PV/T system for space heating, hot water an...
Read More about Development of a next generation, highly efficient, low cost and building integrate-able solar PV/thermal system for building space heating, hot water and power supply.
Projects (11)
Energy from Waste and Biomass Dec 1, 2016 - Dec 31, 2024
Sandeel population in Runswick Bay Apr 24, 2017 - May 31, 2017
A planning application is being prepared for works in Runswick Bay involving the addition of rock revetment to protect the existing sea wall. A sandeel survey has been required by Scarborough Council to support the planning application to assess the...
Read More about Sandeel population in Runswick Bay.
Alkborough Flats Fish Monitoring (2018-19) Aug 1, 2018 - Dec 31, 2019
ABP requires fish monitoring to be undertaken at Alkborough Flats and including fish surveys to be carried out between 2017 and 2018 (spring and autumn) and associated data analysis and reporting. This is to satisfy monitoring requirements of the Env...
Read More about Alkborough Flats Fish Monitoring (2018-19).
Evaluation of the thermo-mechanical pulping of biomass to facilitate release of fermentable sugars for advanced biofuel production Aug 1, 2016 - Apr 1, 2017
_x000D_
The project will evaluate a strategy for lowering the production cost of C6 and C5 sugars from lignocellulosic biomass, which could be fed directly into the current infrastructure for conversion to advanced bioethanol. Continuous pressurise...
Read More about Evaluation of the thermo-mechanical pulping of biomass to facilitate release of fermentable sugars for advanced biofuel production.
Holyhead Port Reclamation: Marine Ecological Survey & Assessment May 1, 2018 - Sep 30, 2018
Provision of a range of marine surveys as part of the wider EIA process for works relating to the upgrade of the Holyhead port infrastructure and capacity.
Tyne Estuary and MetroGreen Edges Softening Aug 1, 2018 - Mar 31, 2019
Holderness MCZ Aug 1, 2018 - Mar 31, 2019
Analysis of benthic macro-invertebrate samples, and subsequent data analysis and reporting.
Natural England have collected 34 x 0.01m² intertidal core samples from the Holderness MCZ and these samples will subsequently require analysis for specie...
Read More about Holderness MCZ.
Survey of Humber Estuary SAC Lagoons Aug 12, 2019 - Feb 29, 2020
Natural England (NE) wishes to commission a baseline survey of the biota and selected physical attributes of two lagoons (Northcoates and Humberstone Fitties lagoons) that are features of the Humber Estuary SAC. The lagoons are located in the outer H...
Read More about Survey of Humber Estuary SAC Lagoons.
CEFAS23-137 LA-ICP-MS analysis on Fish Otoliths Nov 30, 2023 - Sep 30, 2025
Title: CEFAS23-137 Request for Quotation for LA-ICP-MS analysis on fish otoliths
Cefas (The Centre for Environment, Fisheries and Aquaculture Science) the ‘Authority’, is an Executive Agency of the UK Government’s Department for Environment, Food...
Read More about CEFAS23-137 LA-ICP-MS analysis on Fish Otoliths.
Consultancy, Omya. Determination of stearate and carbonate in sample Mar 1, 2024 - Feb 28, 2025
2 XRD data collections (120 each). 4 hours Tim Prior time (125 per hour) on data analysis to determine the relative amounts of carbonate and stearate in the sample. Total £740 plus VAT. Quote HULLSCI22022024.