Skip to main content

Research Repository

Advanced Search

Professor Terry Williams

Image

Terry Williams

Director of the Risk Institute


What is best value in public sector building construction? (2014)
Journal Article
Ojiako, U., Park, J. H., Williams, T., Marshall, A., & Chipulu, M. (2014). What is best value in public sector building construction?. Proceedings of the Institution of Civil Engineers. Management, procurement, and law, 167(5), 209-219. https://doi.org/10.1680/mpal.13.00026

Although the lowest bid procurement philosophy has formed the basis of procurement in public sector building construction, for a long time it has arguably resulted in low-quality construction work. In response, construction stakeholders have sought t... Read More about What is best value in public sector building construction?.

Practical tool for assessing best value at the procurement stage of public building projects in Korea (2014)
Journal Article
Park, J., Ojiako, U., Williams, T., Chipulu, M., & Marshall, A. (2015). Practical tool for assessing best value at the procurement stage of public building projects in Korea. Journal of management in engineering, 31(5), https://doi.org/10.1061/%28ASCE%29ME.1943-5479.0000337

This paper presents a practical tool for articulating best value criteria during the procurement of public-sector building projects in Korea. Data is obtained from sampling 180 stakeholders drawn mainly from a pool of government construction and proj... Read More about Practical tool for assessing best value at the procurement stage of public building projects in Korea.

Exploring the impact of cultural values on project performance: The effects of cultural values, age and gender on the perceived importance of project success/failure factors (2014)
Journal Article
Chipulu, M., Ojiako, U., Gardiner, P., Williams, T., Mota, C., Maguire, S., …Marshall, A. (2014). Exploring the impact of cultural values on project performance: The effects of cultural values, age and gender on the perceived importance of project success/failure factors. International journal of operations & production management, 34(3), 364-389. https://doi.org/10.1108/IJOPM-04-2012-0156

Purpose: This study aims to explore the impact of cultural values on the importance individuals assign to project success/failure factors (PSFFs). Design/methodology/approach: Themes emerging from 40 interviews of project practitioners based in Brazi... Read More about Exploring the impact of cultural values on project performance: The effects of cultural values, age and gender on the perceived importance of project success/failure factors.

Project management learning: key dimensions and saliency from student experiences (2014)
Journal Article
Ojiako, U., Chipulu, M., Ashleigh, M., & Williams, T. (2014). Project management learning: key dimensions and saliency from student experiences. International journal of project management, 32(8), 1445-1458. https://doi.org/10.1016/j.ijproman.2014.02.002

Drawing upon literature, this study seeks to understand what the key dimensions of student experiences of project management learning are and what saliences students attach to such dimensions. Data is obtained from a sample of management and engineer... Read More about Project management learning: key dimensions and saliency from student experiences.

Effect of project role, age and gender differences on the formation and revision of project decision judgements (2013)
Journal Article
Ojiako, U., Chipulu, M., Gardiner, P., Williams, T., Mota, C., Maguire, S., …Stamati, T. (2014). Effect of project role, age and gender differences on the formation and revision of project decision judgements. International journal of project management, 32(4), 556-567. https://doi.org/10.1016/j.ijproman.2013.09.001

In this study, the authors examine how demographic variables such as project role, age and gender moderate the formation and revision of explicit decision judgements in a project by practitioners over the lifecycle of that project. Understanding the... Read More about Effect of project role, age and gender differences on the formation and revision of project decision judgements.

A two-echelon inventory model for a deteriorating item with stock-dependent demand, partial backlogging and capacity constraints (2013)
Journal Article
Ghiami, Y., Williams, T., & Wu, Y. (2013). A two-echelon inventory model for a deteriorating item with stock-dependent demand, partial backlogging and capacity constraints. European journal of operational research, 231(3), 587-597. https://doi.org/10.1016/j.ejor.2013.06.015

This study investigates a two-echelon supply chain model for deteriorating inventory in which the retailer's warehouse has a limited capacity. The system includes one wholesaler and one retailer and aims to minimise the total cost. The demand rate in... Read More about A two-echelon inventory model for a deteriorating item with stock-dependent demand, partial backlogging and capacity constraints.

Managing the social trajectory: a practice perspective on project management (2012)
Journal Article
O'Leary, T., & Williams, T. (2013). Managing the social trajectory: a practice perspective on project management. IEEE Transactions on Engineering Management, 60(3), 566-580. https://doi.org/10.1109/tem.2012.2228206

This paper responds to recent calls to extend the theoretical perspectives taken on the important organizational activity of managing projects, based on a deeper understanding of the reality of their day-to-day social practice. Drawing on theoretical... Read More about Managing the social trajectory: a practice perspective on project management.

Project Governance: Getting Investments Right (2012)
Book
Williams, T. M., & Samset, K. (Eds.). (2012). Project Governance: Getting Investments Right. Palgrave Macmillan. https://doi.org/10.1057/9781137274618

Provides essential insight into what it takes to turn an initial idea into a project with successful outcome in the long term. Fills a gap in current literature on project management and is thoroughly grounded in the latest research in this field.

A multidimensional analysis of project manager competences (2012)
Journal Article
Chipulu, M., Neoh, J. G., Ojiako, U., & Williams, T. (2012). A multidimensional analysis of project manager competences. IEEE Transactions on Engineering Management, 60(3), 506-517. https://doi.org/10.1109/TEM.2012.2215330

Projects are important to industry. Project manager (PM) competences are important in project success. Yet, current competence studies largely rely on small-sample, homogenous PM surveys which could suffer from uncontrollable biases and may not be ge... Read More about A multidimensional analysis of project manager competences.

Identifying and acting on early warning signs in complex projects (2012)
Journal Article
Williams, T., Jonny Klakegg, O., Walker, D. H., Andersen, B., & Morten Magnussen, O. (2012). Identifying and acting on early warning signs in complex projects. Project management journal, 43(2), 37-53. https://doi.org/10.1002/pmj.21259

We consider identification of early warning signs (EWS) in projects. Project professionals are not good at detecting or acting on EWS. Barriers that lead to this are identified. The nature of EWS and their detection change with the evolving situation... Read More about Identifying and acting on early warning signs in complex projects.